Centre Pivot - Maintenance


 

 
 
 

Yearly

bullet

Check air pressure in all tyres.

bullet

Drain any water from gear boxes and refill with proper oil.

bullet

Grease the pivot swivel.

bullet

Check to ensure all drive shafts and shields are in place.

bullet

Check sand trap to make sure sand is not building up.

bullet

Flush the system if it is necessary.

Pre-Season

bullet

Check all sprinklers/nozzles at the start up time to ensure that they are spaying properly, ensure rotation.

bullet

Ensure equipment is properly grounded.

bullet

Check the structure and the drive units

bullet

Check the oil level in the gearboxes

bullet

Check depth of wheel tracks

bullet

Check the functions of the controller

 

End of Season

bullet

Drain the pivot and all the water connections to the pivot.

Periodical

bullet

After the first year of operation, drain and replace the oil from all wheel drive gear boxes and centre drive wheel boxes.

bullet

Change oil in the gearboxes at least every third year under conditions.

bullet

For machines operating more then 1000 hours a year, consider changing oil every year.

bullet

Routinely check bolts for tightness and review the condition of gearbox seals.

 

 
 
 